856  
FOUS11 KWBC 031808  
QPFHSD  
 
PROBABILISTIC HEAVY SNOW AND ICING DISCUSSION  
NWS WEATHER PREDICTION CENTER COLLEGE PARK MD  
208 PM EDT FRI OCT 3 2025  
 
VALID 00Z SAT OCT 04 2025 - 00Z TUE OCT 07 2025  
   
..NORTHERN ROCKIES  
 
DAYS 2-3...  
 
DYNAMIC LONGWAVE PATTERN WILL TRANSPIRE ACROSS THE WESTERN CONUS  
AS WE MOVE INTO THE WEEKEND WITH A DEEP CLOSED UPPER-LOW OVER THE  
GREAT BASIN PIVOTING NORTHEAST INTO THE NORTHERN ROCKIES BEFORE  
OPENING UP INTO A RELATIVELY STRONG NEGATIVELY-TILTED SHORTWAVE  
TROUGH BEFORE EXITING. STRONG HEIGHT-FALLS OCCURRING OVER THE BASIN  
THROUGH THE NORTHERN ROCKIES WILL ALLOW FOR FREEZING LEVELS TO  
PLUMMET OVER THE COURSE OF FRIDAY NIGHT INTO SATURDAY, CONTINUING  
FURTHER INTO EARLY SUNDAY MORNING. COMBINATION OF FALLING HEIGHTS  
AND STRONG UPPER-LEVEL ASCENT ACROSS THE REGION MIXING WITH  
ELEVATED PWATS WILL GENERATE A TRANSITION FROM RAIN TO SNOW ACROSS  
PORTIONS OF THE TETONS OVER INTO THE ABSAROKA/BEARTOOTH RANGES OF  
MT/WY, FOLLOWED BY THE BIG HORN MOUNTAINS A BIT DOWNSTREAM. SNOW  
LEVELS WILL TUMBLE TO AROUND 7000FT MSL BY SUNDAY MORNING ACROSS  
THE TERRAIN WITH A REASONABLE PRECIP DISTRIBUTION CONTRIBUTING TO  
PERIODS OF MODERATE TO LOCALLY HEAVY SNOW WITHIN THE TERRAIN AND  
ADJACENT FOOTHILLS.  
 
AS THAT NEGATIVELY-TILTED SHORTWAVE TRACKS INTO THE PLAINS SUNDAY  
MORNING, A SECOND SHORTWAVE ROUNDING THE BACK OF THE LONGWAVE  
TROUGH WILL DIVE SOUTHEASTWARD OUT OF ALBERTA THROUGH MUCH OF  
MT FROM SATURDAY NIGHT THROUGH MUCH OF THE DAY ON SUNDAY. THIS  
SHORTWAVE WILL RESULT IN A PERIOD OF HEAVY SNOW ACROSS MUCH OF  
GLACIER NP LATE SATURDAY NIGHT THROUGH SUNDAY MORNING. THIS  
SECONDARY FORCING WILL KEEP THE SNOW THAT BEGAN WITH THE FIRST  
SHORTWAVE SATURDAY ONGOING THROUGH SUNDAY. THE SNOW WILL END FROM  
NORTH TO SOUTH SUNDAY AND SUNDAY NIGHT. WPC PROBABILITIES FOR MORE  
THAN 6 INCHES OF SNOW REMAIN BETWEEN 50-90% FOR THE BEARTOOTH,  
ABSAROKA, AND BIG HORN RANGES.  
 
THE PROBABILITY OF SIGNIFICANT ICING IS LESS THAN 10 PERCENT.  
 
WEGMAN/KLEEBAUER  
 
 
CLICK HERE TO GO TO PREVIOUS BULLETINS.
The Nexlab HPC Page
Main Text Page