324  
SRUS51 KBGM 230632  
RR2BGM  
HYDROLOGIC OBSERVATIONS  
NATIONAL WEATHER SERVICE BINGHAMTON NY  
0200 AM EDT WED JUL 23 2025  
 
.B BGM 20250723 E DH0200/HP/LS/QS/QT/QI/QD/PCIRZZ  
:  
:NWS |ELEV FT|K-ACRE FT| K-CFS | K-CFS | K-CFS | K-CFS | IN |SITE  
:ID | HP |STORE LS |SPILL QS| REL QT | QI | DIVR QD|PCPN PC |NAME  
ASEN6 585.34/ 232.597/ 0.000/ 0.000/ 1.207/ 0.8536/ 0.00:ASHOKAN EAST 587.1  
ASWN6 586.13/ 126.757/ 0.000/ 0.033/ -9999/ 0.0000/ 0.00:ASHOKAN WEST 590  
PEPN6 1274.37/ 406.990/ 0.000/ 0.170/ / 0.4678/ 0.00:PEPACTON RES 1280  
NVRN6 1438.16/ 105.124/ 0.000/ 0.150/ / 0.0000/ 0.00:NEVERSINK 1440  
RONN6 837.82/ 147.338/ 0.000/ 0.023/ / 0.9474/ 0.00:RONDOUT RES 840  
GILN6 1117.48/ 43.192/ 0.000/ / / 0.3744/ 0.00:GILBOA RES 1130  
CNNN6 1144.74/ 265.596/ 0.000/ 0.540/ / 0.3102/ 0.00:CANNONSVILLE 1150  
.END  
:  
: SHEF CODE KEY  
: HP - POOL ELEVATION MEASURED IN FEET.  
: LS - LAKE STORAGE VOLUME MEASURED IN THOUSANDS OF ACRE FEET.  
: QS - DISCHARGE, SPILLWAY MEASURED IN THOUSANDS OF CUBIC FEET PER SECOND.  
: QT - DISCHARGE, COMPUTED TOTAL PROJECT OUTFLOW MEASURED IN THOUSANDS OF  
: CUBIC FEET PER SECOND.  
: QI - DISCHARGE, INFLOW MEASURED IN THOUSANDS OF CUBIC FEET PER SECOND.  
: QD - DISCHARGE, AQUEDUCT DIVERSION MEASURED IN THOUSANDS OF CUBIC FEET PER SECOND.  
: PC - PRECIPITATION MEASURED IN INCHES.  
CLICK HERE TO GO TO PREVIOUS BULLETINS.
The Nexlab NY Page
The Nexlab PA Page
Main Text Page