182  
SRUS51 KBGM 061412  
RR2BGM  
HYDROLOGIC OBSERVATIONS  
NATIONAL WEATHER SERVICE BINGHAMTON NY  
0930 AM EDT MON APR 06 2026  
 
.B BGM 20260406 E DH0930/HP/LS/QS/QT/QI/QD/PCIRZZ  
:  
:NWS |ELEV FT|K-ACRE FT| K-CFS | K-CFS | K-CFS | K-CFS | IN |SITE  
:ID | HP |STORE LS |SPILL QS| REL QT | QI | DIVR QD|PCPN PC |NAME  
ASEN6 586.05/ 236.175/ 0.000/ 0.000/ 0.006/ 0.0000/ 0.00:ASHOKAN EAST 587.1  
ASWN6 587.85/ 131.845/ 0.000/ 0.020/ -9999/ 0.5713/ 0.00:ASHOKAN WEST 590  
PEPN6 1280.30/ 439.889/ 0.374/ 0.699/ / 0.4652/ 0.68:PEPACTON RES 1280  
NVRN6 1440.25/ 108.291/ 0.202/ 0.190/ / 0.0008/ 0.00:NEVERSINK 1440  
RONN6 838.44/ 148.627/ 0.000/ 0.016/ / 0.9582/ 0.00:RONDOUT RES 840  
GILN6 1130.39/ 56.713/ 0.903/ / / 0.0316/ 0.00:GILBOA RES 1130  
CNNN6 1151.07/ 294.717/ 0.827/ 1.484/ / 0.0000/ 0.00:CANNONSVILLE 1150  
.END  
:  
: SHEF CODE KEY  
: HP - POOL ELEVATION MEASURED IN FEET.  
: LS - LAKE STORAGE VOLUME MEASURED IN THOUSANDS OF ACRE FEET.  
: QS - DISCHARGE, SPILLWAY MEASURED IN THOUSANDS OF CUBIC FEET PER SECOND.  
: QT - DISCHARGE, COMPUTED TOTAL PROJECT OUTFLOW MEASURED IN THOUSANDS OF  
: CUBIC FEET PER SECOND.  
: QI - DISCHARGE, INFLOW MEASURED IN THOUSANDS OF CUBIC FEET PER SECOND.  
: QD - DISCHARGE, AQUEDUCT DIVERSION MEASURED IN THOUSANDS OF CUBIC FEET PER SECOND.  
: PC - PRECIPITATION MEASURED IN INCHES.  
 
CLICK HERE TO GO TO PREVIOUS BULLETINS.

The Nexlab NY Page
The Nexlab PA Page Main Text Page